1. Equipped with a newly developed ECO energy-saving control algorithm, it ensures optimal performance and minimal losses under low dynamic loads, optimizing output power.
2. Support dredging and multi pump control functions, effectively reducing daily maintenance workload and simplifying control systems to lower costs. Reliable and stable Designed
3. Support mainstream industrial bus extensions (Profibus DP, Profinet, CANopen, Ethernet/IP, Modbus TCP), configured as needed.
Phone: 17357281531
Email: house@trusthz.com
website: http://www.trustelco.com
Address: Room 1215, West Unit, Building 1, CECEP the Taihu Lake First Building, No. 1969, Chuangye Avenue, Longxi Street, South the Taihu Lake New District, Huzhou